Beijing Chixing Carbon Trading Co., Ltd.Clean open socket with compressed air Beijing Chixing Carbon Trading Co., Ltd.
Electrodeshould be storedin a clean,dry placeandavoid vibrationand impact, before useby drying.Clean open socket with compressed air ,screw nipple into socket carefully not to damage threads.Bring down upper electrode until opening between two electrodes becomes 20 to 30mm,clean out opening between electrodes with compressed air .
Whenusing awrenchto To avoid electrode breakage ,remove any insulated materials from the furnace.To avoid electrode breakage ,besure to place large scrap at furnace bottom and small scrap at top.
Whenusing awrenchto connectelectrodesto the specified locationshould betightenedsecurity, so that the twoelectrodes are connectedgapis not greater than0.05mmTo avoid electrode breakage ,remove any insulated materials from the furnace.To avoid electrode breakage ,besure to place large scrap at furnace bottom and small scrap at top.

Recommended Tightening Torque of Graphite Electrodes

Dia(mm)100150200250300350400450500550600
Torque (kg·m)715224560100200250320380430

Directions for Use Graphite Electrodes

1.When the graphite electrodes are selected for electric steel furnace,reference is made to the currentcarrying capacity of the electrodes.
2.The transport and storage of the graphite electrodes must be kept away from being moistened or weted by rain ,snow,andwater.Be sure to dry up before use
3.During loading,unloading andtransportation,the graphite electrodes must be handled with great care to protect the threads from being damaged by collision. In the course of loading ,unloading and hoisting ,it is advisable to use special hoist tools.
4.Before the electrodes are connected to the nipple,it is necessary to below the electrode threads  throughly clean with compressed air and screw the nipple tightly then into the eletrodes.
5. The terminal faces of the two electrodes tightly screw-connected must be kept in close contact.
6.When the elevator of the electric are furnace is hoisting the electrodes, no swing is allowed so as to avoid the electrode joints being loosened and dislocated.
7.The tighting devices of the electrodes must not hold the electrode near the area of the nipple sockets.
8. In order to prevent the breakage of the electrodes in case of scrap cave-ins,lift the electrodes in time according to the melting condition and dump the unmelted waste steel into the pool.
9. Charging the furnace,put the large scrap steel lumps at the buttom and the small ones at the top .
10.In order to prevent dislocation after the electrodes being joints, we provide binding paste and pins which is easily to be applied.

Beijing Zhixing Carbon Co., Ltd.
Add: No.8,South Ring Road, Haoxinzhuang Village,Linzhang County,Handan City,Hebei,China.
Tel: +86-310-7822095
Mob: +86-18810758518; +86-13739649715
Email: balint@chixcarbon.com      endy@chixcarbon.com        
Website: http://www.bchix.com